Bio-rad ChromLab™ Software Uživatelský manuál Strana 152

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 300
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 151
5 | Method Editor
150 | NGC Chromatography Systems and ChromLab Software
Column switching valve
Outlet valve
Sample inlet valves
Wash solution is delivered through Q1 for the sample loop, pH flow cell,
and column switching valve.
Sample inlet valves are washed by using the sample pump to pull wash
solution through ports 1–8 on S1 (if only one sample inlet valve is present)
or ports 1–7 on S1 and ports 1–8 on S2 (if two sample inlet valves are
present).
Ports Q1, Q2, Q3, and Q4 are washed individually with 5 ml.
Buffer inlet ports A1–7 and B1–7 are not washed.
To clean the flow paths completely
Clean the manual inject port and pH valve manually.
Ensure that the pH probe is removed from the pH valve and that all column
ports ar
e connected to bypass tubing.
To clean the pH valves
1. Open the System Control window.
2. Select Tools > Calibrate to open the Calibration dialog box.
Note: No calibration is performed in this procedure.
3. Choose pH in the Calibrate dropdown list.
4. Click Start to set the valve flow path.
5. Fill a syringe with 1 M NaOH, connect the syringe to the pH valve Cal In port,
and inject the solution.
Zobrazit stránku 151
1 2 ... 147 148 149 150 151 152 153 154 155 156 157 ... 299 300

Komentáře k této Příručce

Žádné komentáře