Bio-rad ChromLab™ Software Uživatelský manuál Strana 283

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 306
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 282
Plumbing NGC Systems
Instrument Guide | 281
To plumb the buffer inlet valves
1. Connect tubing from Outlet A on the buffer blending valve to port 8/BB on
buffer inlet valve A.
2. Connect tubing from Outlet B on the buffer blending valve to port 8/BB on inlet
valve B.
3. Connect tubing from the Out port on inlet valve A to the inlet manifold of system
pump A.
4. Connect tubing from the Out port on inlet valve B to the inlet manifold of
system pump B.
5. (Optional) Connect inlet tubing to ports 2–7 on both buffer inlet valves A and B.
To plumb the sample pump
1. Connect inlet tubing to the sample pump inlet manifold.
2. Immerse the other end of the inlet tubing in a bottle of degassed, deionized
water.
3. Connect outlet tubing to the Sample Pump port on the sample inject valve.
Zobrazit stránku 282
1 2 ... 278 279 280 281 282 283 284 285 286 287 288 ... 305 306

Komentáře k této Příručce

Žádné komentáře