
Plumbing NGC Systems
Instrument Guide | 267
To plumb and prime the system pump wash lines
1. Mount a tube holder to the right or left side of the instrument in either the upper
or lower rack slots.
2. Fill a 50 ml tube with 20% isopropanol (IPA) and insert it in the tube holder.
Tip: You can use 20% ethanol as an alternative.
3. Connect inlet tubing to the pump wash inlet port (left rear port) on
system pump A.
4. Immerse the other end of the pump A wash inlet tubing in the tube of 20% IPA.
5. Connect the pump head wash priming tubing to the outlet (right rear port) on
system pump B.
6. Connect a 1/4-28 female to female luer adaptor to the pump head wash
priming tubing.
7. Connect a 1/4-28 union to a second inlet tubing. You will use the inlet tubing as
the outlet tubing for system pump B.
Tip: Set the inlet tubing with the attached union aside. Keep it close by, as
you will attach it to the pump head wash priming tubing on step 12.
Komentáře k této Příručce